Product Highlights
Designed to protect throughput and improve testing reliability, the WECO 9000 Warm-Up Board helps you quickly validate common readiness items—like meter power-up, display function, AMI communication, firmware version, disconnect switch operation,
and clear error status—so meters with basic failures don’t consume valuable time on your accuracy Test Boards.
The result is a more stable, repeatable screening process that keeps downstream testing focused on true measurement validation.


Features
- Fast functional validation to screen meters for readiness before accuracy testing (power-up, display, comms, firmware, disconnect, errors).
- Integrated meter detection + socket interlocks so sockets are not powered when empty—supporting a safer, dead-front design (no meter blanks needed).
- Isolated banks of four sockets with their own power switch, circuit breaker protection, and LED power status—so operators can change meters without shutting down the entire board.
- Line-side / load-side indicator LEDs at each socket to support quick verification of disconnect switch status.
- Resettable breakers designed to protect against misuse or faulty meter connections—supporting long-term operational stability.
- Aluminum construction with locking wheels for durable, mobile shop deployment.
- Configurable standard build: typically double-sided with 40 Form 2S sockets per side and 240V at each socket, with customization options for socket count, single/double-sided layout, meter forms, socket voltage, and 120V or 240V service voltage.


Stable, Repeatable Testing
Can't Find What You're Looking For?

























